Region Plant Location Potential Capacity (MW) Year Available
Region VI Northern Negros Bago City, Negros Occidental 53.83 2007
  Mandalagan Mandalagan, Negros Occidental 20 2014
Region VII Palinpinon Optimization Palinpinon, Negros Oriental 20 2008
  Dauin Dauin, Negros Oriental 40 2011
Region VIII Cabalian Cabalian, Southern Leyte 100 2011
  Biliran Biliran, Biliran 20 2009
Field Installed Cap (MW) Steamfield Operator Power Plant Operator
Tongonan 1 112.5 EDC Green Core Geothermal Inc.
Unified Leyte 610.18 EDC EDC
Palinpinon 1 112.5 EDC Green Core Geothermal Inc.
Palinpinon 2 80 EDC Green Core Geothermal Inc.
Northern Negros Geothermal Field 49 MW - Plant dismantled and transferred to Nasulo, Palinpinon 2 area. EDC has to present to DOE correct resizing capacity.
Total 915.18 MW    